DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Engineering data exchange format for use in industrial automation systems engineering - Automation Markup Language - Part 6: AutomationML Components

30.60 Close of voting/ comment period

TC 65/SC 65E më tepër

Flexible displays - Part 6-22: Mechanical test methods - Crease and waviness measurement methods for foldable displays

40.60 Close of voting

TC 110 më tepër

Flexible displays - Part 6-42: Mechanical test methods - Flattening force measurement methods for rollable display devices

40.60 Close of voting

TC 110 më tepër

Flexible displays - Part 6-43: Mechanical test methods - Deformation measurement of rollable display

30.20 CD study/ballot initiated

TC 110 më tepër

Flexible displays - Part 6-61: Mechanical test methods - Deformation and usage scenarios for stretchable display device

20.99 WD approved for registration as CD

TC 110 më tepër

Photovoltaic (PV) modules - Ammonia corrosion testing

20.99 WD approved for registration as CD

TC 82 më tepër

Safety of machinery - Requirements for cableless control systems of machinery

40.00 DIS registered

TC 44 më tepër

Systems interface between customer energy management system and the power management system - Part 10-1: Open Automated Demand Response (OpenADR 2.0b Profile Specification)

60.00 Standard under publication

PC 118 më tepër

Terminology for voltage-sourced converters (VSC) for high-voltage direct current (HVDC) systems

20.99 WD approved for registration as CD

TC 22/SC 22F më tepër

Amendment 2 - Terminology for voltage-sourced converters (VSC) for high-voltage direct current (HVDC) systems

60.00 Standard under publication

TC 22/SC 22F më tepër

Assessment of power quality - Characteristics of electricity supplied by public networks

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 8 më tepër

Calibration of space charge measuring equipment based on the pulsed electro-acoustic (PEA) measurement principle – Part 2: High temperature measurement

20.99 WD approved for registration as CD

TC 112 më tepër

Twinax cables for digital communication - Part 3: Family specification - Cable for SAS physical interfaces

30.60 Close of voting/ comment period

TC 46/SC 46C më tepër

Distributed energy resources connection with the grid - Part 10: Tests

20.99 WD approved for registration as CD

TC 8 më tepër

Distributed energy resources connection with the grid - Generating plants and units grid connection standard mapping

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 8 më tepër

Distributed energy resources connection with the grid - Part 101 Gravity storage connection to the grid

50.00 Final text received or FDIS registered for formal approval

TC 8 më tepër

IEC TR 62786-103 Distributed energy resources connection with the grid – Part 103 V2G application scenarios for the grid

30.20 CD study/ballot initiated

TC 8 më tepër

Distributed energy resources connection with the grid - Part 2: Additional requirements for PV generation systems

50.60 Close of voting. Proof returned by secretariat

TC 8 më tepër