DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Future IEC 63203-2XX-X: Wearable electronic devices and technologies - Part 2XX-X: Test method for impedance of E-textiles

10.60 Close of voting

TC 124 më tepër

Future IEC 63203-402-X : Wearable electronic devices and technologies - Part 402-X: Performance of stress measurements within limited context of wearable consumer stress monitoring solutions

10.60 Close of voting

TC 124 më tepër

Future IEC 63203-402-X: Wearable electronic devices and technologies - Part 402-X: Definitions, Characteristics, and Performance Measurement for Features in Wearable Sleep Monitors

10.60 Close of voting

TC 124 më tepër

Future IEC 63203-402-X: Wearable electronic devices and technologies - Part 402-X: Wearable technology for sleep monitoring and care - Framework and general requirements

00.99 Approval to ballot proposal for new project

TC 124 më tepër

Respiratory equipment -- Clinical investigation of clinical thermometers

40.99 Full report circulated: DIS approved for registration as FDIS

TC 62/SC 62D më tepër

Use case methodology guide

20.99 WD approved for registration as CD

Safety and performance requirements of series hybrid transporters

00.00 Proposal for new project received

TC 125 më tepër

E-Transporters – Part 4-2: Electromagnetic compatibility (EMC) requirements and test methods for e-Transporters – Immunity

10.20 New project ballot initiated

TC 125 më tepër

Safety and performance of light personal e-transporters with or without a seat

00.00 Proposal for new project received

TC 125 më tepër

Safety and performance of electric trailers

00.00 Proposal for new project received

TC 125 më tepër

Test methods for determination of distance range and energy consumption for electric scooters

00.00 Proposal for new project received

TC 125 më tepër

Development of product specific rules to assess the carbon footprint of products

20.99 WD approved for registration as CD

ACEA më tepër

Guidelines for safety related risk assessment and risk reduction for collaborative safety system

40.20 DIS ballot initiated: 12 weeks

ACOS më tepër

Low-voltage auxiliary power systems ‒Part 2-4: Design criteria- Low-voltage AC auxiliary power systems for hydropower stations

00.99 Approval to ballot proposal for new project

PC 127 më tepër

Guide on use of terminology in IEC committee

20.99 WD approved for registration as CD

ACDC më tepër

Guide on the Development of a new standard as database (SDB)

20.99 WD approved for registration as CD

ACDC më tepër

Robotics for electricity generation, transmission and distribution systems — Wheeled, tracked or legged robots — Part 3‑21: Overhead transmission line inspection robot — General requirements

10.20 New project ballot initiated

TC 129 më tepër

Robotics for electricity generation, transmission and distribution systems — Wheeled, tracked or legged robots — Part 3‑31: Land cable tunnel inspection robot — General requirements.

10.20 New project ballot initiated

TC 129 më tepër