Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Aerospace — Nuts, metric — Tolerances of form and position
40.20 DIS ballot initiated: 12 weeks
Wire rope slings — Safety criteria and inspection procedures for use
30.60 Close of voting/ comment period
Steel wire ropes — Ferrule-secured eye terminations
30.60 Close of voting/ comment period
Road Vehicles — AI Safety — Part 1: Definitions and concepts
00.00 Proposal for new project received
Road Vehicles — AI Safety — Part 2: General requirements
00.00 Proposal for new project received
Aircraft — Solid-state remote power controllers — General requirements
20.00 New project registered in TC/SC work programme
Road vehicles — Fuse-links — Part 3: Fuse-links with tabs (blade type) Type C (medium), Type E (high current) and Type F (miniature)
60.00 Standard under publication
Road vehicles — Fuse-links — Part 4: Fuse-links with female contacts (type A) and bolt-in contacts (type B) and their test fixtures
10.99 New project approved
Road vehicles — Fuse-links — Part 8: Fuse-links with bolt-in contacts (Type H and J) with rated voltage of 450 V
20.00 New project registered in TC/SC work programme
Anaesthetic and respiratory equipment — Suction catheters for use in the respiratory tract
40.60 Close of voting
Fine ceramics (advanced ceramics, advanced technical ceramics) — Test methods for evaluating the stability of fine ceramic and fine ceramic/metal multilayer coatings for the exposure to corrosive environments
20.60 Close of comment period
Hard coal — Froth flotation testing — Part 1: Laboratory procedure
30.99 CD approved for registration as DIS
Elastomeric parts for parenterals and for devices for pharmaceutical use — Part 1: Extractables in aqueous autoclavates
30.20 CD study/ballot initiated
Elastomeric parts for parenterals and for devices for pharmaceutical use — Part 2: Identification and characterization
30.99 CD approved for registration as DIS
Elastomeric parts for parenterals and for devices for pharmaceutical use — Part 3: Determination of released-particle count
10.99 New project approved
Elastomeric parts for parenterals and for devices for pharmaceutical use — Part 4: Biological requirements and test methods
20.00 New project registered in TC/SC work programme
Rigid cellular plastics — Spray-applied polyurethane foam for thermal insulation — Part 1: Material specification
40.99 Full report circulated: DIS approved for registration as FDIS