Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Rare earth- Pre-assessment and sorting of recyclable NdFeB resources
00.00 Proposal for new project received
Specification for Certified Reference Materials of High-Purity Yttrium Oxides for GD-MS
00.00 Proposal for new project received
Vegetable oils — Determination of individual and total oryzanol content in rice bran oils — Part 1: High-performance liquid chromatographic method (HPLC)
20.00 New project registered in TC/SC work programme
Vegetable oils — Determination of gamma oryzanol content in rice bran oil — Part 2: UV Spectrometric method
10.60 Close of voting
Workplace air — Exposure assessment strategies — Part 1: General requirements
00.00 Proposal for new project received
Workplace air — Exposure assessment strategies — Part 2: Strategy for testing compliance with inhalation occupational exposure limit values
00.00 Proposal for new project received
Guidelines for energy efficiency management of urban wastewater treatment facilities
20.20 Working draft (WD) study initiated
Identification and assessment of nature-related issues: the LEAP (Locate, Evaluate, Assess, Prepare) approach
10.20 New project ballot initiated
Rattan for furniture — General requirements
20.00 New project registered in TC/SC work programme
Tokenization Methods in Distributed Ledger Technologies (DLTs)
20.00 New project registered in TC/SC work programme
Interoperable spaceborne remote sensing services
20.00 New project registered in TC/SC work programme
Healthcare organization management — Smart hospitals — Guidelines for establishing a centralized control system for hospital’s internal pharmaceutical logistics using autonomous mobile robots
30.60 Close of voting/ comment period
Guidelines of tools and techniques application for Six Sigma, Lean and Lean Six Sigma
30.00 Committee draft (CD) registered
Circular Economy — Extended Producer Responsibility (EPR) — Requirements and guidelines for implementation
20.00 New project registered in TC/SC work programme
Fireworks — Category 4 — Part 1: Terminology
20.00 New project registered in TC/SC work programme
Fireworks — Category 4 — Part 2: Requirements
20.00 New project registered in TC/SC work programme
Fireworks — Category 4 — Part 3: Test methods
20.00 New project registered in TC/SC work programme