Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Intelligent transport systems — Minimal risk manoeuvre (MRM) for automated driving — Part 2: Road shoulder stop — Minimum requirements and test procedures
20.00 New project registered in TC/SC work programme
Intelligent transport systems — Minimal Risk Maneuver (MRM) for automated driving — Part 2: Requirements and test procedures for stopping without lane change control
00.00 Proposal for new project received
Intelligent transport systems – Extracting trip data using nomadic and mobile devices for estimating CO2 emissions — Part 4: Estimation of greenhouse gas emissions in transport sectors
00.00 Proposal for new project received
Fire safety engineering – Concept and example applications of risk-based fire safety design of buildings
30.60 Close of voting/ comment period
Gas cylinders — Seamless tubes, composite tubes and large tubes permanently mounted in a frame — Periodic inspection and testing
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Ships and marine technology — Ballast water management systems (BWMS) — Procedures for commissioning and testing BWMS using electrolytic methods
40.99 Full report circulated: DIS approved for registration as FDIS
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 2: Thermoset composite materials
30.60 Close of voting/ comment period
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 4: Thermoplastic composite materials
30.20 CD study/ballot initiated
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 5: Unplasticized Polyamide (PA-U) material
10.99 New project approved
Eggs and egg products — Determination of nitroimidazole residues — Liquid chromatography-tandem mass spectrometry method
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Road vehicles — Guidelines for the structure and layout of data communication standards
10.99 New project approved
Geometrical product specifications (GPS) — Association — Mathematical concepts
30.99 CD approved for registration as DIS
Chicken tissue and eggs — Determination of marker residues of nicarbazin — Liquid chromatography tandem mass spectrometry method
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Preparation of metallographic specimens used for porosity determination
10.99 New project approved
Ultrasonic testing of hardmetals
50.00 Final text received or FDIS registered for formal approval
Mobile machinery — High speed interconnect (HSI) — Part 1: Part 1: General information and vocabulary
10.20 New project ballot initiated
Mobile machinery — High speed interconnect (HSI) — Part 10: Communication channel
40.20 DIS ballot initiated: 12 weeks
Mobile machinery — High speed interconnect (HSI) — Part 2: Part 2: System and network architecture
10.20 New project ballot initiated