Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Road vehicles — Vehicle domain service (VDS) — Part 3: Network and transport layer requirements
00.00 Proposal for new project received
Road vehicles — Vehicle domain service (VDS) — Part 3: Network and transport layer requirements
00.00 Proposal for new project received
Road vehicles — Vehicle domain service (VDS) — Part 4: Physical and data link layer requirements
00.00 Proposal for new project received
Road vehicles — Vehicle domain service (VDS) — Part 4: Physical and data link layer requirements
00.00 Proposal for new project received
Automation systems and integration — Digital twin framework for manufacturing — Part 101: Use case on management of robotic multilayer and multipass gas-shielded metal arc welding process
60.00 Standard under publication
Automation systems and integration — Digital twin framework for manufacturing — Part 5: Digital thread for digital twin
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Automation systems and integration — Digital twin framework for manufacturing — Part 6: Digital twin composition
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Survey for operational procedure with airspace conflict management systems
30.99 CD approved for registration as DIS
Blockchain and distributed ledger technologies — Reference architecture
20.00 New project registered in TC/SC work programme
Blockchain and distributed ledger technologies — Taxonomy and Ontology
20.60 Close of comment period
Non-destructive testing of welds — Ultrasonic testing — Characterization of discontinuities in welds
30.60 Close of voting/ comment period
Industrial trucks — Hook-on type fork arms and fork arm carriages — Mounting dimensions
40.00 DIS registered
Plastics — A method for measuring the amount of bacteria in the hydrosphere biodegradability assessment
40.20 DIS ballot initiated: 12 weeks
Railway applications — Interior electrical lighting for passenger rolling stock — Part 1: Main line
40.99 Full report circulated: DIS approved for registration as FDIS
Railway applications — Interior electrical lighting for passenger rolling stock — Part 2: Urban guided transport
00.00 Proposal for new project received
Information and documentation — Transliteration of Perso-Arabic characters into Latin characters — Part 1: Arabic language
40.20 DIS ballot initiated: 12 weeks
Information and documentation — Transliteration of Perso-Arabic characters into Latin characters — Part 3: Persian language
50.00 Final text received or FDIS registered for formal approval
Fork-lift trucks — Fork arms — Technical characteristics and testing
00.00 Proposal for new project received