Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Non-destructive testing — Gamma scanning method of highly attenuating container walls — Evaluation of the integrity of various shielding structures by using gamma topography technique
20.60 Close of comment period
Human performance in physical environments — Part 1: A performance framework
30.99 CD approved for registration as DIS
Dynamic signs in physical environments — Part 2: Visibility, safety, and accessibility
30.60 Close of voting/ comment period
Bases for design of structures — Seismic actions for designing geotechnical works
20.20 Working draft (WD) study initiated
Safety of machinery — Ergonomic principles for the design of sorting cabins intended for the manual sorting of dry household and similar waste originating from selective collection
30.99 CD approved for registration as DIS
Medical Devices — Quality management systems — Guideline for the application of ISO 13485:2016
20.60 Close of comment period
Biotechnology — Provenance information model for biological material and data — Part 2: Common provenance model
60.00 Standard under publication
Biotechnology — Provenance information model for biological material and data — Part 3: Provenance of biological material
40.60 Close of voting
Biotechnology — Provenance information model for biological material and data — Part 4: Provenance of data generation
00.00 Proposal for new project received
Preparation and quality management of fluids for haemodialysis and related therapies — Part 1: General requirements
30.60 Close of voting/ comment period
Preparation and quality management of fluids for haemodialysis and related therapies — Part 2: Water treatment equipment for haemodialysis applications and related therapies
30.60 Close of voting/ comment period
Preparation and quality management of fluids for haemodialysis and related therapies — Part 3: Water for haemodialysis and related therapies
30.60 Close of voting/ comment period
Preparation and quality management of fluids for haemodialysis and related therapies — Part 4: Concentrates for haemodialysis and related therapies
30.60 Close of voting/ comment period
Preparation and quality management of fluids for haemodialysis and related therapies — Part 5: Quality of dialysis fluid for haemodialysis and related therapies
30.60 Close of voting/ comment period
Bevel and hypoid gear geometry — Part 2: Sample calculations
60.00 Standard under publication
Rubber — General procedures for preparing and conditioning test pieces for physical test methods — Amendment 1
40.20 DIS ballot initiated: 12 weeks