Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Rubber — General procedures for preparing and conditioning test pieces for physical test methods — Amendment 1
40.20 DIS ballot initiated: 12 weeks
Requirements for sleeping bags — Part 3: Extreme sleeping bags
00.00 Proposal for new project received
Controls and protective devices for gaseous and liquid fuels — General requirements
40.60 Close of voting
Controls and protective devices for gaseous fuels — Particular requirements — Part 13: Pressure and/or flow rate regulators for inlet pressures up to and including 500 kPa, electronic types
00.00 Proposal for new project received
Controls and protective devices for gaseous and liquid fuels — Particular requirements — Part 14: Gas filters having a maximum working pressure up to and including 500 kPa
10.20 New project ballot initiated
Safety and control devices for gas burners and gas-burning appliances — Particular requirements — Part 4: Valve-proving systems for automatic shut-off valves
00.00 Proposal for new project received
Gas pressure safety and control devices for use in gas transmission, distribution and installations for inlet pressures up to and including 10 MPa — Part 1: General requirements
20.00 New project registered in TC/SC work programme
Gas pressure safety and control devices for use in gas transmission, distribution and installations for inlet pressures up to and including 10 MPa — Part 2: Gas pressure regulator
20.00 New project registered in TC/SC work programme
Nuclear facilities — Classification of challenging conditions for HEPA filters design and qualification
20.00 New project registered in TC/SC work programme
Image technology colour management — Evaluating colour transform accuracy in ICC profiles
40.60 Close of voting
Biotechnology — Bioprocessing — General requirements and considerations for equipment systems used in the manufacturing of cellular therapeutic products
40.20 DIS ballot initiated: 12 weeks
Natural gas — Measurement of properties — Inferential devices — Performance evaluation
20.00 New project registered in TC/SC work programme
Sulfur corrosion test method of copper winding in electric field for power equipment
60.00 Standard under publication
Safety and environment information for biogas plants, biogas transportation and biogas use
50.92 FDIS or proof referred back to TC or SC
Technical product specification (TPS) — Application guidance — International model for national implementation
00.00 Proposal for new project received
Petroleum products and lubricants — Life time testing of rolling bearing greases — Part 1: Part 1: Generalities — Principle of the evaluation of upper temperature limit of use
10.60 Close of voting
Guidelines for operation and maintenance of MSW leachate treatment and reuse system
40.00 DIS registered
UAS traffic management (UTM) — Part 12: Requirements for UTM service providers
40.00 DIS registered