Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Brazing — Specification and qualification of brazing procedures for metallic materials
40.60 Close of voting
Oil and gas industries including lower carbon energy — Test methods for quality control of microstructure of ferritic/austenitic (duplex) stainless steels
00.00 Proposal for new project received
Milk, milk products and mesophilic starter cultures — Enumeration of citrate-fermenting lactic acid bacteria — Colony-count technique
00.00 Proposal for new project received
Reactor technology — Design and performance evaluation of the emergency core cooling system strainer in pressurized water reactor nuclear power plants — Part 1: General principles
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Road vehicles — Information for first and second responders — Part 3: Emergency response guide template — Amendment 1: Road vehicles —Information for first and second responders —Part 3: Emergency response guide template
10.99 New project approved
Road vehicles — Information for first and second responders — Part 3: Emergency response guide template — Amendment 2
10.99 New project approved
Road vehicles — Information for first and second responders — Part 4: Propulsion energy identification
30.60 Close of voting/ comment period
Safety of amusement rides and amusement devices — Part 1: Design and manufacture
20.00 New project registered in TC/SC work programme
Welding and allied processes — Health and safety — Wordless product safety labels for equipment and consumables used in arc welding and cutting
40.20 DIS ballot initiated: 12 weeks
Industrial Classification for Ocean Industries and Their Related Activities
20.00 New project registered in TC/SC work programme
Guidance on the validation and verification of quantitative and qualitative methods
20.00 New project registered in TC/SC work programme
Digital Imaging — Geometric distortion (GD) measurements
30.20 CD study/ballot initiated
Geometrical product specification (GPS) — Tolerancing of moveable assemblies
00.00 Proposal for new project received
Ceramic tiles — Guidelines for installation — Part 2: Installation of thin ceramic wall and floor tiles and panels
00.60 Close of review
Gas cylinders — Quick-release cylinder valves — Specification and type testing — Amendment 2
40.60 Close of voting
Nuclear facilities — Criteria for the design and the operation of ventilation systems for nuclear installations other than nuclear reactors
30.20 CD study/ballot initiated