Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Test method of doorset opening performance in diagonal deformation — Seismic aspects
00.00 Proposal for new project received
Rubber compounding ingredients — Carbon black — Determination of aggregate size distribution by disc centrifuge photosedimentometry
50.00 Final text received or FDIS registered for formal approval
Road vehicles — Design and performance specifications for the WorldSID 50th percentile male side-impact dummy — Part 1: Vocabulary and rationale
00.00 Proposal for new project received
Road vehicles — Design and performance specifications for the WorldSID 50th percentile male side-impact dummy — Part 2: Mechanical subsystems
00.00 Proposal for new project received
Road vehicles — Design and performance specifications for the WorldSID 50th percentile male side-impact dummy — Part 3: Mechanical requirements for electronic subsystems
00.00 Proposal for new project received
Road vehicles — Design and performance specifications for the WorldSID 50th percentile male side impact dummy — Part 4: User's manual
00.00 Proposal for new project received
Steels for the reinforcement of concrete — Reinforcement couplers for mechanical splices of bars — Part 1: Requirements
30.00 Committee draft (CD) registered
Steels for the reinforcement of concrete — Reinforcement couplers for mechanical splices of bars — Part 2: Test methods
30.00 Committee draft (CD) registered
Industrial valves — Measurement, test and qualification procedures for fugitive emissions — Part 1: Classification system and qualification procedures for type testing of valves — Amendment 2
20.00 New project registered in TC/SC work programme
Industrial valves — Measurement, test and qualification procedures for fugitive emissions — Part 2: Production acceptance test of valves
10.99 New project approved
UV-C devices — Safety information — Permissible human exposure
50.00 Final text received or FDIS registered for formal approval
Industrial trucks — Specifications for indicator lights for container handling and grappler arm operations
30.60 Close of voting/ comment period
Plastics piping systems for hot and cold water installations — Polypropylene (PP) — Part 1: General
30.60 Close of voting/ comment period
Plastics piping systems for hot and cold water installations — Polypropylene (PP) — Part 2: Pipes
30.60 Close of voting/ comment period
Plastics piping systems for hot and cold water installations — Polypropylene (PP) — Part 3: Fittings
30.60 Close of voting/ comment period
Plastics piping systems for hot and cold water installations — Polypropylene (PP) — Part 5: Fitness for purpose of the system
30.60 Close of voting/ comment period
Washer-disinfectors — Part 4: Requirements and tests for washer-disinfectors employing chemical disinfection for thermolabile endoscopes
40.00 DIS registered
Information and documentation — Transliteration of Indic scripts into Latin characters
40.99 Full report circulated: DIS approved for registration as FDIS