Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Gears — Thermal capacity — Part 2: Thermal load-carrying capacity
20.00 New project registered in TC/SC work programme
Implants for surgery — Wear of total hip-joint prostheses — Part 1: Loading and displacement parameters for wear-testing machines and corresponding environmental conditions for test
20.99 WD approved for registration as CD
Implants for surgery — Wear of total hip-joint prostheses — Part 3: Loading and displacement parameters for orbital bearing type wear testing machines and corresponding environmental conditions for test
00.00 Proposal for new project received
Implants for surgery — Wear of total hip-joint prostheses — Part 4: Testing hip prostheses under variations in component positioning which results in direct edge loading
00.00 Proposal for new project received
Implants for surgery — Wear of total knee-joint prostheses — Part 1: Methodology for simulator wear testing of tibio-femoral joints under force control.
30.60 Close of voting/ comment period
Implants for surgery — Wear of total knee-joint prostheses — Part 3: Methodology for simulator wear testing of tibio-femoral joints under displacement control.
30.60 Close of voting/ comment period
Implants for surgery — Wear of total knee prostheses — Part 5: Durability performance of the patellofemoral joint
00.00 Proposal for new project received
Steel — Metallographic characterization of duplex grain size and distributions
50.00 Final text received or FDIS registered for formal approval
Geometrical product specifications (GPS) — Inspection by measurement of workpieces and measuring equipment — Part 2: Guidance for the estimation of uncertainty in GPS measurement, in calibration of measuring equipment and in product verification
00.00 Proposal for new project received
Geometrical product specifications (GPS) — Inspection by measurement of workpieces and measuring equipment — Part 6: Generalized decision rules for the acceptance and rejection of instruments and workpieces
00.00 Proposal for new project received
Oil and gas industries including lower carbon energy — Downhole equipment — Packers and bridge plugs
20.00 New project registered in TC/SC work programme
Mineral and sapphire watch-glasses — Part 5: Anti-fingerprint treatment
20.00 New project registered in TC/SC work programme
Soil quality — Acid-base accounting procedure for acid sulfate soils — Part 1: Introduction and definitions, symbols and acronyms, sampling and sample preparation
30.99 CD approved for registration as DIS
Soil quality — Acid-base accounting procedure for acid sulfate soils — Part 2: Chromium reducible sulfur (CRS) methodology
30.99 CD approved for registration as DIS
Soil quality — Acid-base accounting procedure for acid sulfate soils — Part 3: Suspension peroxide oxidation combined acidity and sulfur (SPOCAS) methodology
30.99 CD approved for registration as DIS
Calculation method of GHG emission intensity from iron and steel production
30.20 CD study/ballot initiated
Geometrical product specifications (GPS) — Dimensional tolerancing — Part 3: Angular sizes
00.00 Proposal for new project received