Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Personal flotation devices — Part 7: Materials and components — Safety requirements and test methods
20.00 New project registered in TC/SC work programme
Lithium carbonate — Determination of chloride content by potentiometry
40.00 DIS registered
Chemical analysis of lithium composite oxides — Part 1: Determination of main components by inductively coupled plasma optical emission spectrometry
50.00 Final text received or FDIS registered for formal approval
Chemical analysis of lithium composite oxides — Part 2: Determination of trace elemental impurities by inductively coupled plasma optical emission spectrometry
50.00 Final text received or FDIS registered for formal approval
Chemical analysis of lithium composite oxides — Part 3: Determination of lithium carbonate and lithium hydroxide contents
50.00 Final text received or FDIS registered for formal approval
Aluminium pigments for paints — Part 3: Treated aluminium pigments
40.60 Close of voting
Cranes — Monitoring for crane design working period
30.60 Close of voting/ comment period
Cranes — Tolerances for wheels and travel and traversing tracks — Part 1: General
30.20 CD study/ballot initiated
Oil and gas industries including lower carbon energy — Mechanical integrity and sizing of actuators and mounting kits for pipeline valves
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Natural rubber latex concentrate — Determination of alkalinity
40.20 DIS ballot initiated: 12 weeks
Skin barrier for ostomy aids — Test methods — Part 3: Characteristics of Convexity
20.00 New project registered in TC/SC work programme
Timber structures — Glued laminated timber — Component performance requirements
40.60 Close of voting
Aircraft ground handling — Checked baggage — Part 2: Handling requirements and guidelines
40.00 DIS registered
Terminology work in support of multilingual communication — Part 2: Terminology workflows in high-complexity environments
20.00 New project registered in TC/SC work programme
Road vehicles — Liquefied natural gas (LNG) refuelling connector — 3,1 MPa connector
30.60 Close of voting/ comment period