Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Ergonomics of the thermal environment — Determination and interpretation of cold stress when using required clothing insulation (IREQ) and local cooling effects
30.99 CD approved for registration as DIS
Spices and condiments — Determination of non-volatile ether extract
40.20 DIS ballot initiated: 12 weeks
Paper and board — Testing of cores — Part 10: Determination of core axial crush
50.00 Final text received or FDIS registered for formal approval
Paper and board — Testing of cores — Part 9: Determination of flat crush resistance
20.00 New project registered in TC/SC work programme
ISO 11111-1 rev, Textile machinery — Safety requirements — — Part 1: Part 1: Common requirements
10.20 New project ballot initiated
ISO 11111-2 rev, Textile machinery — Safety requirements - — Part 2: Part 2: Spinning preparatory and spinning machines
10.20 New project ballot initiated
ISO 11111-3 rev, Textile machinery — Safety requirements — — Part 3: Part 3: Nonwoven machinery
10.20 New project ballot initiated
ISO 11111-4 rev, Textile machinery — Safety requirements - — Part 4: Part 4: Yarn processing, cordage and rope manufacturing machinery
10.20 New project ballot initiated
ISO 11111-5 rev, Textile machinery — Safety requirements - — Part 5: Part 5: Preparatory machinery to weaving and knitting
10.20 New project ballot initiated
ISO 11111-6 rev, Part 5: Preparatory machinery to weaving and knitting - — Part 6: Part 6: Fabric manufacturing machinery
10.20 New project ballot initiated
ISO 11111-7 rev, Textile machinery — Safety requirements - — Part 7: Part 7: Dyeing and finishing machinery
10.20 New project ballot initiated
Gas cylinders — Compatibility of cylinder and valve materials with gas contents — Part 1: Metallic materials
30.20 CD study/ballot initiated
Gas cylinders — Compatibility of cylinder and valve materials with gas contents — Part 2: Non-metallic materials
30.20 CD study/ballot initiated
Gas cylinders — Valve protection caps and guards — Design, construction and tests — Amendment 1
50.00 Final text received or FDIS registered for formal approval
Gas cylinders — Design, construction and testing of refillable composite gas cylinders and tubes — Part 2: Fully wrapped fibre reinforced composite gas cylinders and tubes up to 450 l with load-sharing metal liners
30.20 CD study/ballot initiated
Gas cylinders — Design, construction and testing of refillable composite gas cylinders and tubes — Part 3: Fully wrapped fibre reinforced composite gas cylinders and tubes up to 450 l with non-load-sharing metallic or non-metallic liners or without liners
30.20 CD study/ballot initiated
Preparation of steel substrates before application of paints and related products — Specifications for metallic blast-cleaning abrasives — Part 1: General introduction and classification
60.00 Standard under publication
Preparation of steel substrates before application of paints and related products — Specifications for non-metallic blast-cleaning abrasives — Part 9: Staurolite
30.00 Committee draft (CD) registered