DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania

ISO 5124:2024

Loading and unloading of liquefied natural gas (LNG) tank wagons and containers

Oct 1, 2024

General information

60.60     Oct 1, 2024

ISO

ISO/TC 67/SC 9

International Standard

75.200  

English   French  

Buying

Published

Language in which you want to receive the document.

Scope

This document provides requirements and recommendations for the design, construction and operation of newly installed liquefied natural gas (LNG) railway loading and unloading facilities for use on onshore LNG terminals, LNG satellite plants, handling LNG tank wagons or tank containers engaged in international trade.
The designated boundary limits of this document are between the LNG terminal’s inlet/outlet piping headers at the beginning of the rail loading or unloading area and the rail track area used for LNG tank wagons and containers. It is applicable to all rail loading bays, weighbridge(s) and related subsystems.

Life cycle

NOW

PUBLISHED
ISO 5124:2024
60.60 Standard published
Oct 1, 2024

National adoptions

Loading and unloading of liquefied natural gas (LNG) tank wagons and containers (ISO 5124:2024)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more