ISO 21905:2020

Gas turbine exhaust systems with or without waste heat recovery

Mar 5, 2020

General information

90.60     Jun 5, 2025

ISO

ISO/TC 192

International Standard

27.040  

English  

Buying

Published

Language in which you want to receive the document.

Scope

This document specifies requirements and gives recommendations for the design, materials of construction, modelling, controlling, fabrication, inspection, testing, installation, start-up and operation of industrial gas turbine (GT) exhaust systems with or without waste heat recovery unit (WHRU). Gas turbines can be on-shore or off-shore for such sectors as oil and gas, chemical and process industries, utilities, or other intensive energy users.
For this document, the exhaust system means all items in the turbine exhaust gas stream between the GT exhaust gas collector outlet flange and the termination/s to the atmosphere.
The following items are not covered by this document:
— heat recovery steam generator equipment (HRSG);
— supplementary fired systems;
— auxiliary fired systems;
— exhaust gas collector (also known as exhaust plenum);
— fire detection and extinguishing systems;
— emissions controls equipment intended to modify the gaseous composition of the exhaust gas;
— WHRUs that are of the firetube type, where the turbine exhaust gas (TEG) passes through the tubes.

Life cycle

NOW

PUBLISHED
ISO 21905:2020
90.60 Close of review
Jun 5, 2025