Replaced
IEC TS 62257-9-7:2019 specifies the criteria for selecting and sizing inverters suitable for different off-grid applications integrating solar as an energy source.
As well as off-grid system, this document can also apply to inverters where a utility grid connection is available as a backup for charging batteries, but it is not intended to cover applications in which inverters synchronize and inject energy back into a utility grid, even though this capability may incidentally be a part of the functionality of the inverters. Single and multi-phase applications are included.
WITHDRAWN
IEC TS 62257-9-7:2019 ED1
99.60
Withdrawal effective
Dec 10, 2025
PUBLISHED
IEC TS 62257-350:2025 ED1
Renewable energy and hybrid systems for rural electrification - Part 9-7: Recommendations for selection of inverters
60.60 Standard published