prSSH EN ISO 22074-7:2025

Railway infrastructure - Rail fastening systems - Part 7: Test method for clamping force and uplift stiffness (ISO 22074-7:2021)

General information

50.99     May 12, 2025

60.60   

DPS

DPS/KT 256

European Norm

45.080  

Scope

This document specifies the laboratory test procedure for determining the clamping force exerted by the fastening system on the foot of the rail by measuring the force to separate the rail foot from its immediate support. When required, the procedure is also used to determine the uplift stiffness of the fastening system.
It is applicable to systems with and without baseplates on all types of sleepers, bearers or elements of ballastless track. The test does not determine the security of the fastening components fixed into the sleeper or other fastening system support.
This test procedure applies to a complete fastening assembly. It is not applicable to fastening systems for embedded rail or other fastening systems which do not act on the foot of the rail.

Life cycle

NOW

IN_DEVELOPMENT
prSSH EN ISO 22074-7:2025
50.99 FDIS or proof approved for publication
May 12, 2025

Related project

Adopted from EN ISO 22074-7:2024 IDENTICAL

Adopted from ISO 22074-7:2021 IDENTICAL