DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

SSH EN 50546:2020

Railway applications - Rolling Stock - Three-phase shore (external) supply system for rail vehicles and its connectors

Apr 26, 2021

General information

60.60     Apr 26, 2021

95.99    May 1, 2026

DPS

DPS/KT 7

European Norm

29.120.30     45.060.01  

English  

Buying

Published

Language in which you want to receive the document.

Scope

This document specifies requirements for the shore supply system for auxiliaries and pre-conditioning and the related intermateable connector pairs. This standard specifies the characteristics of the connectors in order to achieve interoperability at the rolling-stock/shore power supply interface.
This document does not apply to shore supplies to move the rolling stock.

Related directives

Directives related to this standards.

2016/797/EU

Directive (EU) 2016/797 of the European Parliament and of the Council of 11 May 2016 on the interoperability of the rail system within the European Union (Text with EEA relevance)

Life cycle

NOW

PUBLISHED
SSH EN 50546:2020
60.60 Standard published
Apr 26, 2021

REVISED BY

IN_DEVELOPMENT
prSSH EN 50546:2024

Related project

Adopted from EN 50546:2020 IDENTICAL