SSH EN 12699:2000

Execution of special geotechnical work - Displacement piles

Jan 25, 2008
95.99 Withdrawal of Standard   Dec 14, 2015

General information

95.99     Dec 14, 2015

DPS

DPS/KT 288

European Norm

93.020  

English  

Buying

Withdrawn

Language in which you want to receive the document.

Scope

1.1 This standard establishes general principles for the execution of displacement piles which are installes in the ground without excavation or removal of material from the ground except for limiting heave, vibration, removal of obstructions or to assist penetration. Piles are driven into the ground using impact, vibration, pressing, screwing or a combination of these methods. The material of displacement piles covered by this standard can be: -steel, -cast iron, -concrete, -timber, -grout, -combination of above.

Life cycle

NOW

WITHDRAWN
SSH EN 12699:2000
95.99 Withdrawal of Standard
Dec 14, 2015

REVISED BY

PUBLISHED
SSH EN 12699:2015

Related project

Adopted from EN 12699:2000