Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Type F and type B residual current operated circuit-breakers with and without integral overcurrent protection for household and similar uses
30.60 Close of voting/ comment period
Railway applications - Communication, signalling and processing systems - Safety related electronic systems for signalling
60.00 Standard under publication
Railway applications - Compatibility between rolling stock and train detection systems
60.00 Standard under publication
Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods
20.99 WD approved for registration as CD
Industrial communication networks - High availability automation networks - Part 2: Media Redundancy Protocol (MRP)
20.99 WD approved for registration as CD
Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR)
20.99 WD approved for registration as CD
Security for automation and control systems – Part 1-1: Overview and Guidance for the IEC 62443 Series
30.60 Close of voting/ comment period
Security for Industrial Automation and Control Systems - Part 1-6: Application of the IEC 62443 series to the Industrial Internet of Things (IIoT)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Security for industrial automation and control systems - Part 2-4: Security program requirements for IACS service providers
30.20 CD study/ballot initiated
Security for industrial automation and control systems - Part 4-1: Secure product development lifecycle requirements
30.20 CD study/ballot initiated
Security for Automation and Control Systems - Part 6-1: Security evaluation methodology for IEC 62443-2-4
30.99 CD approved for registration as DIS
Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 1: Grid connected systems - Documentation, commissioning tests and inspection
40.99 Full report circulated: DIS approved for registration as FDIS
Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 3: Photovoltaic modules and plants - Outdoor infrared thermography
20.99 WD approved for registration as CD
Photovoltaic (PV) system - Requirements for testing, documentation and maintenance - Part 4: Photovoltaic modules and plants - Outdoor electroluminescence imaging
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Radiation protection instrumentation - Determination of uncertainty in measurement
50.60 Close of voting. Proof returned by secretariat
Interpretation Sheet 1 - Photobiological safety of lamps and lamp systems - Part 7: Light sources and luminaires primarily emitting visible radiation
60.00 Standard under publication
Amendment 1 - Photobiological safety of lamps and lamp systems - Part 7: Light sources and luminaires primarily emitting visible radiation
30.20 CD study/ballot initiated
Material declaration for products of and for the electrotechnical industry
20.99 WD approved for registration as CD