DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Amendment 2 - Terminology for voltage-sourced converters (VSC) for high-voltage direct current (HVDC) systems

60.00 Standard under publication

TC 22/SC 22F more

Assessment of power quality - Characteristics of electricity supplied by public networks

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 8 more

Calibration of space charge measuring equipment based on the pulsed electro-acoustic (PEA) measurement principle – Part 2: High temperature measurement

20.99 WD approved for registration as CD

TC 112 more

Twinax cables for digital communication - Part 3: Family specification - Cable for SAS physical interfaces

30.99 CD approved for registration as DIS

TC 46/SC 46C more

Distributed energy resources connection with the grid - Part 10: Tests

20.99 WD approved for registration as CD

TC 8 more

Distributed energy resources connection with the grid - Generating plants and units grid connection standard mapping

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 8 more

Distributed energy resources connection with the grid - Part 101 Gravity storage connection to the grid

50.00 Final text received or FDIS registered for formal approval

TC 8 more

IEC TR 62786-103 Distributed energy resources connection with the grid – Part 103 V2G application scenarios for the grid

30.20 CD study/ballot initiated

TC 8 more

Distributed energy resources connection with the grid - Part 2: Additional requirements for PV generation systems

60.00 Standard under publication

TC 8 more

Distributed energy resources connection with the grid - Part 42: Technical requirements for voltage measurement used to control DER and loads

60.00 Standard under publication

TC 8 more

Amendment 2 - Measurement procedures for materials used in photovoltaic modules - Part 1-4: Encapsulants - Measurement of optical transmittance and calculation of the solar-weighted photon transmittance, yellowness index, and UV cut-off wavelength

20.99 WD approved for registration as CD

TC 82 more

Amendment 1 - Measurement procedures for materials used in photovoltaic modules - Part 2-1: Polymeric materials - Frontsheet and backsheet - Safety requirements

40.00 DIS registered

TC 82 more

Amendment 1 - Measurement procedures for materials used in photovoltaic modules - Part 7-2: Environmental exposures - Accelerated weathering tests of polymeric materials

20.99 WD approved for registration as CD

TC 82 more

Measurement method for the output of electroshock weapons

50.00 Final text received or FDIS registered for formal approval

TC 85 more

Thunderstorm warning systems - Protection against lightning

20.99 WD approved for registration as CD

TC 81 more

Hybrid telecommunication cables - Part 1: Generic specification

20.99 WD approved for registration as CD

TC 46/SC 46C more

Hybrid telecommunication cables - Part 2: Indoor hybrid cables - Sectional specification

40.99 Full report circulated: DIS approved for registration as FDIS

TC 46/SC 46C more

Amendment 2 - Photovoltaic systems - Design qualification of solar trackers

40.20 DIS ballot initiated: 12 weeks

TC 82 more