DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Electronic railway equipment - Train communication network (TCN) - Part 1: General architecture

60.00 Standard under publication

TC 9 more

Electronic railway equipment - Train communication network (TCN) - Part 2-3: TCN communication profile

40.20 DIS ballot initiated: 12 weeks

TC 9 more

Electronic railway equipment - Train communication network (TCN) - Part 2-5: Ethernet train backbone

40.20 DIS ballot initiated: 12 weeks

TC 9 more

Electronic railway equipment - Train communication network (TCN) - Part 2-6: Train-to-ground communication

50.60 Close of voting. Proof returned by secretariat

TC 9 more

Electronic railway equipment - Train communication network (TCN) - Part 2-7: Wireless Train Backbone (WLTB)

20.99 WD approved for registration as CD

TC 9 more

Electronic railway equipment - Train communication network (TCN) - Part 3-4: Ethernet Consist Network (ECN)

20.99 WD approved for registration as CD

TC 9 more

Interpretation Sheet 1 - Wind energy generation systems - Part 1: Design requirements

00.99 Approval to ballot proposal for new project

TC 88 more

Design requirements for Wind Turbine Generators

20.99 WD approved for registration as CD

TC 2 more

Wind energy generation systems - Part 12: Power performance measurements of electricity producing wind turbines - Overview

20.99 WD approved for registration as CD

TC 88 more

Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines

20.99 WD approved for registration as CD

TC 88 more

Wind energy generation systems - Part 12-2: Power performance of electricity producing wind turbines based on nacelle anemometry

20.99 WD approved for registration as CD

TC 88 more

Wind energy generation systems - Part 12-3: Power performance - Measurement based site calibration

20.99 WD approved for registration as CD

TC 88 more

Wind energy generation systems - Part 12-5: Power performance - Assessment of obstacles and terrain

30.99 CD approved for registration as DIS

TC 88 more

Wind energy generation systems - Part 12-5: Power performance - Assessment of obstacles and terrain

20.99 WD approved for registration as CD

TC 88 more

Wind energy generation systems - Part 12-6: Measurement based nacelle transfer function of electricity producing wind turbines

20.99 WD approved for registration as CD

TC 88 more

Wind energy generation systems - Part 12-80: Power performance measurements of electricity producing Airborne Wind Energy Systems (AWES)

20.99 WD approved for registration as CD

TC 88 more

Amendment 1 - Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines

40.20 DIS ballot initiated: 12 weeks

TC 88 more

Wind energy generation systems – Part 16: Standard format for sharing power curves and associated information.

30.60 Close of voting/ comment period

TC 88 more