Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Common Dynamic Data Structures for DAM, RT, FTR
00.00 Proposal for new project received
Electrical insulation systems (EIS) - Thermal evaluation of combined liquid and solid components - Part 1: General requirements
50.00 Final text received or FDIS registered for formal approval
Electrical insulation systems (EIS) - Thermal evaluation of combined liquid and solid components - Part 2: Simplified test
30.60 Close of voting/ comment period
Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones
40.20 DIS ballot initiated: 12 weeks
Organic light emitting diode (OLED) displays - Part 6-4: Measuring methods of transparent properties
30.20 CD study/ballot initiated
Amendment 1 - Dynamic modules - Generic specification
60.00 Standard under publication
Power systems management and associated information exchange - Data and communications security - Part 14: Cyber security event logging
40.20 DIS ballot initiated: 12 weeks
Power systems management and associated information exchange - Data and communications security - Part 15: Deep Packet Inspection (DPI) of encrypted communications
40.99 Full report circulated: DIS approved for registration as FDIS
Power systems management and associated information exchange - Data and communications security - Part 16: Profiles for Ethernet security, MACsec (IEC 62351-16)
20.99 WD approved for registration as CD
Power systems management and associated information exchange - Data and communications security - Part 8: Role-based access control for power system management
50.00 Final text received or FDIS registered for formal approval
Role-based access control - Definition of roles and permissions for engineering
50.00 Final text received or FDIS registered for formal approval
Power systems management and associated information exchange - Data and communications security - Part 90-4: Migration of cryptographic algorithms
30.60 Close of voting/ comment period
Ferrite cores - Standard inductance factor for gapped cores and its tolerance
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Power systems management and associated information exchange - Interoperability in the long term - Part 104: CIM Profiles to JSON Schema Mapping
20.99 WD approved for registration as CD
Selection of optical fibre cable specifications relative to mechanical, ingress, climatic or electromagnetic characteristics - Guidance
40.99 Full report circulated: DIS approved for registration as FDIS
Hydraulic machines - Guidelines for dealing with hydro-abrasive erosion in Kaplan, Francis and Pelton turbines
30.99 CD approved for registration as DIS
Medical devices - Part 2: Guidance on the application of usability engineering to medical devices
30.60 Close of voting/ comment period