Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Amendment 3 - Fragment 2: Two homogenous antennas
20.99 WD approved for registration as CD
Amendment 3 - Fragment 3: Calculable loop antennas
30.60 Close of voting/ comment period
Amendment 3 - Fragment 5: C-SAM
30.99 CD approved for registration as DIS
Fragment 1: General Maintenance and CISPR history
40.99 Full report circulated: DIS approved for registration as FDIS
Fragment 2: Relationship of limits for SAC and FAR
30.60 Close of voting/ comment period
Fragment 3: Rationale for measurements and procedures for wired network port emissions
40.99 Full report circulated: DIS approved for registration as FDIS
Specification for radio disturbance and immunity measuring apparatus and methods - Part 4-2: Uncertainties, statistics and limit modelling - Measurement instrumentation uncertainty
30.99 CD approved for registration as DIS
DC Rigid Gas-Insulated Transmission Line For Rated Voltage above 100kV
10.60 Close of voting
High-voltage switchgear and controlgear - Part 307: Procedures for the extension of validity of type tests of AC metal and solid-insulation enclosed switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
10.60 Close of voting
Utility connections in port – Part 4: DC shore connection (DCSC) systems – General requirements
10.60 Close of voting
Marine Battery Containers - Part 1: Technical Requirements
10.20 New project ballot initiated
Marine Battery Containers - Part 2: Connection and Interface System
10.20 New project ballot initiated
Information technology — Introduction to quantum computing
20.99 WD approved for registration as CD
Electrical installations in ships - Part xxx: Ship-to-shore connection cables of rated voltages up to and including 18/30 kV
10.20 New project ballot initiated
Electrical installations in ships - Part 3XX:Bus cables
10.20 New project ballot initiated
Eye and face protection — Protection against laser radiation — Part 2: Guidance on the selection and use of laser eye and face protection related to ISO 19818-1
30.60 Close of voting/ comment period
Gaseous hydrogen - Fuel system components for hydrogen fuelled vehicles - Part 2: Rail vehicles
30.20 CD study/ballot initiated