DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Aerospace series - Steel X12CrNiMoV12-3 (1.4938) - Air melted and consumable electrode remelted - Hardened and tempered - Bars - De ≤ 150 mm - 900 MPa ≤ Rm ≤ 1 100 MPa

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Aerospace series - ECO efficiency of catering equipment - Part 01: General conditions

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Aerospace series - ECO efficiency of catering equipment - Part 02: Oven equipment

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Aerospace series - ECO efficiency of catering equipment - Part 03: Chilling equipment

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Aerospace series - ECO efficiency of catering equipment - Part 04: Beverage makers

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Aerospace series - ECO efficiency of catering equipment - Part 05: Trash compactor

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Aerospace series - ECO efficiency of catering equipment - Part 06: Espresso maker

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Aerospace series - Metrological assessment procedure for kinematic fields measured by digital image correlation

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Aerospace series - Environmental testing - High dynamic abrasion, mar, scratch and punch test in cabin interior

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Aerospace series - Definitions of imperfections and defects in organic matrix composite materials

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

District heating pipes - Bonded single pipe systems for directly buried hot water networks - Part 1: Factory made steel shut-off valve assembly for steel service pipes, polyurethane thermal insulation and a casing of polyethylene

40.20 DIS ballot initiated: 12 weeks

DPS/KT 74 more

District heating and district cooling pipes - Bonded pipe systems for directly buried hot and cold water networks - Part 2: Factory made steel service valve assembly for steel service pipes, polyurethane thermal insulation and a casing of polyethylene

40.20 DIS ballot initiated: 12 weeks

DPS/KT 74 more

Aerospace series - Surface treatments - Terms, definitions and test methods

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Aerospace series - ECO efficiency of seats

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Energy audits — Part 1: General requirements with guidance for use

10.00 Proposal for new project registered

DPS/KT 3 more

Energy management systems - Guidelines for a phased implementation (ISO 50005:2021)

10.00 Proposal for new project registered

DPS/KT 3 more

Energy management systems — Evaluating energy performance using energy performance indicators and energy baselines

10.00 Proposal for new project registered

DPS/KT 3 more

Hand-held electrostatic application equipment for non-ignitable liquid coating materials - Safety requirements

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more