Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Home and Building Electronic Systems (HBES) - Part 6-2: IoT Semantic Ontology model description
10.00 Proposal for new project registered
Fixed installations for railway applications - Electrical safety, earthing and the return circuit - Part 1: Protective provisions against electric shock
40.20 DIS ballot initiated: 12 weeks
Fixed installations for railway applications - Electrical safety, earthing and the return circuit - Part 2: Provisions against the effects of stray currents caused by DC traction systems
40.20 DIS ballot initiated: 12 weeks
Fixed installations for railway applications - Electrical safety, earthing and the return circuit - Part 3: Mutual Interaction of AC and DC traction systems
40.20 DIS ballot initiated: 12 weeks
Alarm systems - Intrusion and hold-up systems - Part 2-8: Requirements for shock detectors
40.20 DIS ballot initiated: 12 weeks
Dense and insulating shaped refractory products - Determination of modulus of rupture at ambient temperature (ISO 5014:2025)
40.20 DIS ballot initiated: 12 weeks
Railway applications - Fixed installations - Particular requirements for a.c. switchgear - Part 3-1: Measurement, control and protection devices for specific use in a.c. traction systems - Devices
40.20 DIS ballot initiated: 12 weeks
Voltage characteristics of electricity supplied by public electricity networks
10.00 Proposal for new project registered
Information technology - Generic cabling systems - Part 10: Single pair cabling
10.00 Proposal for new project registered
Information technology - Cabling installation - Part 4: Testing of installed optical fibre cabling
10.00 Proposal for new project registered
Automatic electrostatic application systems for ignitable liquid coating materials - Safety requirements
40.20 DIS ballot initiated: 12 weeks
Electrical insulating protective clothing for low-voltage installations
40.20 DIS ballot initiated: 12 weeks
Railway applications - Current collection systems - Requirements for and validation of measurements of the dynamic interaction between pantograph and overhead contact line
40.20 DIS ballot initiated: 12 weeks
Overhead electrical lines exceeding AC 1 kV - Part 2-24: National Normative Aspects (NNA) for Romania (based on EN 50341-1:2012)
10.00 Proposal for new project registered
Railways applications - Fixed installations and rolling stock - Criteria to achieve technical compatibility between pantographs and overhead contact line
40.20 DIS ballot initiated: 12 weeks