DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Home and Building Electronic Systems (HBES) - Part 6-2: IoT Semantic Ontology model description

10.00 Proposal for new project registered

DPS/KT 9 more

Fixed installations for railway applications - Electrical safety, earthing and the return circuit - Part 1: Protective provisions against electric shock

40.20 DIS ballot initiated: 12 weeks

DPS/KT 7 more

Fixed installations for railway applications - Electrical safety, earthing and the return circuit - Part 2: Provisions against the effects of stray currents caused by DC traction systems

40.20 DIS ballot initiated: 12 weeks

DPS/KT 7 more

Fixed installations for railway applications - Electrical safety, earthing and the return circuit - Part 3: Mutual Interaction of AC and DC traction systems

40.20 DIS ballot initiated: 12 weeks

DPS/KT 7 more

Alarm systems - Intrusion and hold-up systems - Part 2-8: Requirements for shock detectors

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Dense and insulating shaped refractory products - Determination of modulus of rupture at ambient temperature (ISO 5014:2025)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 67 more

Railway applications - Fixed installations - Particular requirements for a.c. switchgear - Part 3-1: Measurement, control and protection devices for specific use in a.c. traction systems - Devices

40.20 DIS ballot initiated: 12 weeks

DPS/KT 7 more

Voltage characteristics of electricity supplied by public electricity networks

10.00 Proposal for new project registered

DPS/KT 3 more

Information technology - Generic cabling systems - Part 10: Single pair cabling

10.00 Proposal for new project registered

DPS/KT 9 more

Information technology - Cabling installation - Part 4: Testing of installed optical fibre cabling

10.00 Proposal for new project registered

DPS/KT 9 more

Automatic electrostatic application systems for ignitable liquid coating materials - Safety requirements

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Connectors for thermoelectric sensors

00.00 Proposal for new project received

DPS/KT 12 more

Electrical insulating protective clothing for low-voltage installations

40.20 DIS ballot initiated: 12 weeks

DPS/KT 4 more

Railway applications - Current collection systems - Requirements for and validation of measurements of the dynamic interaction between pantograph and overhead contact line

40.20 DIS ballot initiated: 12 weeks

DPS/KT 7 more

Overhead electrical lines exceeding AC 1 kV - Part 2-24: National Normative Aspects (NNA) for Romania (based on EN 50341-1:2012)

10.00 Proposal for new project registered

DPS/KT 3 more

Railways applications - Fixed installations and rolling stock - Criteria to achieve technical compatibility between pantographs and overhead contact line

40.20 DIS ballot initiated: 12 weeks

DPS/KT 7 more

Conductor cars

40.20 DIS ballot initiated: 12 weeks

DPS/KT 4 more

Conductor cars

40.20 DIS ballot initiated: 12 weeks

DPS/KT 4 more