Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Aerospace series - ECO efficiency of catering equipment - Part 06: Espresso maker
40.20 DIS ballot initiated: 12 weeks
Aerospace series - Metrological assessment procedure for kinematic fields measured by digital image correlation
40.20 DIS ballot initiated: 12 weeks
Aerospace series - Environmental testing - High dynamic abrasion, mar, scratch and punch test in cabin interior
40.20 DIS ballot initiated: 12 weeks
Aerospace series - Definitions of imperfections and defects in organic matrix composite materials
40.20 DIS ballot initiated: 12 weeks
District heating pipes - Bonded single pipe systems for directly buried hot water networks - Part 1: Factory made steel shut-off valve assembly for steel service pipes, polyurethane thermal insulation and a casing of polyethylene
40.20 DIS ballot initiated: 12 weeks
District heating and district cooling pipes - Bonded pipe systems for directly buried hot and cold water networks - Part 2: Factory made steel service valve assembly for steel service pipes, polyurethane thermal insulation and a casing of polyethylene
40.20 DIS ballot initiated: 12 weeks
Aerospace series - Surface treatments - Terms, definitions and test methods
40.20 DIS ballot initiated: 12 weeks
Energy audits — Part 1: General requirements with guidance for use
10.00 Proposal for new project registered
Energy management systems - Guidelines for a phased implementation (ISO 50005:2021)
10.00 Proposal for new project registered
Energy management systems — Evaluating energy performance using energy performance indicators and energy baselines
10.00 Proposal for new project registered
Hand-held electrostatic application equipment for non-ignitable liquid coating materials - Safety requirements
40.20 DIS ballot initiated: 12 weeks
Home and Building Electronic Systems (HBES) - Part 4-4: HBES IoT Point API
10.00 Proposal for new project registered
Home and Building Electronic Systems (HBES) - Part 6-2: IoT Semantic Ontology model description
10.00 Proposal for new project registered
Fixed installations for railway applications - Electrical safety, earthing and the return circuit - Part 1: Protective provisions against electric shock
40.20 DIS ballot initiated: 12 weeks
Fixed installations for railway applications - Electrical safety, earthing and the return circuit - Part 2: Provisions against the effects of stray currents caused by DC traction systems
40.20 DIS ballot initiated: 12 weeks
Fixed installations for railway applications - Electrical safety, earthing and the return circuit - Part 3: Mutual Interaction of AC and DC traction systems
40.20 DIS ballot initiated: 12 weeks
Alarm systems - Intrusion and hold-up systems - Part 2-8: Requirements for shock detectors
40.20 DIS ballot initiated: 12 weeks