Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Space systems — Launch pad and integration site — Facility, system and equipment failure analysis
40.20 DIS ballot initiated: 12 weeks
Space data and information transfer systems — Audit and certification of trustworthy digital repositories
50.00 Final text received or FDIS registered for formal approval
Space systems — Stable operation requirements for satellite attitude and orbit control system
40.99 Full report circulated: DIS approved for registration as FDIS
Space data and information transfer systems — Requirements for bodies providing audit and certification of candidate trustworthy digital repositories
40.99 Full report circulated: DIS approved for registration as FDIS
Space systems — Liquid rocket engines and test stands — Terms and definitions
40.99 Full report circulated: DIS approved for registration as FDIS
Space systems — Programme management — Risk management
50.00 Final text received or FDIS registered for formal approval
Space systems — Design qualification and acceptance tests of small spacecraft and units
30.60 Close of voting/ comment period
Space systems — Product assurance requirements for commercial satellites
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Space systems — Space solar cells — Calibration procedures
30.99 CD approved for registration as DIS
Space systems — Launch complexes modernization process — General requirements
50.00 Final text received or FDIS registered for formal approval
Space systems — Fracture and damage control
40.99 Full report circulated: DIS approved for registration as FDIS
Space systems — Launch window estimation and collision avoidance
40.99 Full report circulated: DIS approved for registration as FDIS
Space data and information transfer systems — Information preparation to enable long term use
50.00 Final text received or FDIS registered for formal approval
Space systems — Identifying, evaluating, and avoiding collisions between orbiting objects
40.00 DIS registered
Space systems — Failure reporting, analysis and corrective action (FRACA) process requirements
50.00 Final text received or FDIS registered for formal approval
Space systems — Space Traffic Coordination (STC)
20.00 New project registered in TC/SC work programme