DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

ISO 8528-1:2005

Reciprocating internal combustion engine driven alternating current generating sets — Part 1: Application, ratings and performance
95.99 Withdrawal of Standard   2 shk 2018

General information

95.99     2 shk 2018

ISO

ISO/TC 70

International Standard

29.160.40     27.020  

Scope

ISO 8528-1:2005 defines various classifications for the application, rating and performance of generating sets consisting of a Reciprocating Internal Combustion (RIC) engine, Alternating Current (a.c.) generator and any associated controlgear, switchgear and auxiliary equipment.
It applies to a.c. generating sets driven by RIC engines for land and marine use excluding generating sets used on aircraft or to propel land vehicles and Iocomotives.
For some specific applications (e.g. essential hospital supplies, high-rise buildings), supplementary requirements may be necessary. The provisions of ISO 8528-1:2005 should be regarded as the basis for establishing any supplementary requirements.
For other reciprocating-type prime movers (e.g. sewage-gas engines, steam engines), the provisions of ISO 8528-1:2005 should be used as a basis for establishing these requirements.
Generating sets meeting the requirements of ISO 8528-1:2005 are used to generate electrical power for continuous, peak-load and standby applications. The classifications laid down in ISO 8528-1:2005 are intended to help understanding between manufacturer and customer.

Life cycle

PREVIOUSLY

Revises
ISO 8528-1:1993

NOW

WITHDRAWN
ISO 8528-1:2005
95.99 Withdrawal of Standard
2 shk 2018

REVISED BY

PUBLISHED
ISO 8528-1:2018

National adoptions

Motor alternativ me djegie të brendshme i vënë në veprim nga grupe që prodhojnë rrymë alternative - Pjesa 1: Zbatimi, parametrat dhe performancat

95.99 Withdrawal of Standard

DPS/KT 211 më tepër

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login