DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

ISO/TS 15877-7:2003

Plastics piping systems for hot and cold water installations — Chlorinated poly(vinyl chloride) (PVC-C) — Part 7: Guidance for the assessment of conformity
95.99 Withdrawal of Standard   3 sht 2009

General information

95.99     3 sht 2009

ISO

ISO/TC 138/SC 2

Technical Specification

23.040.01     91.140.60     23.040.20  

Scope

ISO/TS 15877-7:2003 gives guidance for the assessment of conformity to be included in the manufacturer's quality plan as part of the manufacturer's quality system.
It includes:
requirements for materials, components, joints and assemblies given in the applicable part(s) of ISO 15877;requirements for the manufacturer's quality system;definitions and procedures to be applied if third-party certification is involved.
In conjunction with the other parts of ISO 15877, ISO/TS 15877-7 is applicable to chlorinated poly(vinyl chloride) (PVC-C) piping systems intended to be used for hot and cold water installations, within buildings, for the conveyance of water which may or may not be intended for human consumption (domestic systems) or for heating systems, under design pressures and temperatures appropriate to the class of application.

Life cycle

NOW

WITHDRAWN
ISO/TS 15877-7:2003
95.99 Withdrawal of Standard
3 sht 2009

REVISED BY

WITHDRAWN
ISO/TS 15877-7:2009

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login