Revised
Gives new measuring methods for the recovered charge and reverse recovery time as well as for the peak reverse power of avalanche and controlled-avalanche rectified diodes.
WITHDRAWN
IEC 60747-2:1983 ED1
WITHDRAWN
IEC 60747-2:1983/AMD1:1992 ED1
99.60
Withdrawal effective
21 mar 2000
WITHDRAWN
IEC 60747-2:2000 ED2