DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

IEC 62351-3:2014 ED1

Power systems management and associated information exchange - Data and communications security - Part 3: Communication network and system security - Profiles including TCP/IP
27 shk 2020

General information

99.60     6 qer 2023

IEC

TC 57

International Standard

33.200  

anglisht   frëngjisht  

Buying

Revised

Language in which you want to receive the document.

Scope

IEC 62351-3:2014 specifies how to provide confidentiality, integrity protection, and message level authentication for SCADA and telecontrol protocols that make use of TCP/IP as a message transport layer when cyber-security is required. Although there are many possible solutions to secure TCP/IP, the particular scope of this part is to provide security between communicating entities at either end of a TCP/IP connection within the end communicating entities. This part of IEC 62351 reflects the security requirements of the IEC power systems management protocols.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC TS 62351-3:2007 ED1

NOW

WITHDRAWN
IEC 62351-3:2014 ED1
99.60 Withdrawal effective
6 qer 2023

CORRIGENDA / AMENDMENTS

WITHDRAWN
IEC 62351-3:2014/AMD1:2018 ED1

WITHDRAWN
IEC 62351-3:2014/AMD2:2020 ED1

REVISED BY

PUBLISHED
IEC 62351-3:2023 ED2