DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

IEC TR 61850-7-510:2012 ED1

Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines
22 mar 2012

General information

99.60     16 dhj 2021

IEC

TC 57

Technical Report

33.200  

anglisht  

Buying

Revised

Language in which you want to receive the document.

Scope

IEC/TR 61850-7-510:2012(E) provides explanations on how to use the Logical Nodes defined in IEC 61850-7-410 as well as other documents in the IEC 61850 series to model complex control functions in power plants, including variable speed pumped storage power plants. This publication is to be used in conjunction with IEC 61850-7-410 which introduced the general modelling concepts of IEC 61850 to hydroelectric power plants. Keywords: power utility, automation, communication, hydroelectric

Life cycle

NOW

WITHDRAWN
IEC TR 61850-7-510:2012 ED1
99.60 Withdrawal effective
16 dhj 2021

REVISED BY

PUBLISHED
IEC TR 61850-7-510:2021 ED2