DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

IEC TS 62642-7:2011 ED1

Alarm systems - Intrusion and hold-up systems - Part 7: Application guidelines
10 shk 2011

General information

60.60     10 shk 2011

IEC

TC 79

Technical Specification

13.320  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

IEC/TS 62642-7:2011(E) provides guidance on the design, planning, operation, installation, commissioning and maintenance of intrusion and hold-up alarm system (I&HAS) installed in buildings. Requirements for I&HAS are specified in IEC 62642-1:2010. It also applies to intruder alarm system and hold-up alarm system when these systems are installed independently. These application guidelines are intended to assist those responsible for establishing an I&HAS to ascertain the appropriate design of I&HAS both in terms of the extent of the supervision required and in determining the grade of system performance necessary to provide the degree of supervision considered appropriate.

Life cycle

PREVIOUSLY

Replaces
IEC 60839-1-4:1989 ED1

NOW

PUBLISHED
IEC TS 62642-7:2011 ED1
60.60 Standard published
10 shk 2011

National adoptions

Sisteme alarmi - Sistemet e mbrojtjes ndaj ndërhyrjeve dhe grabitjeve - Pjesa 7: Udhëzime për aplikim

60.60 Standard published

DPS/KT 6 më tepër

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login