IEC 61850-7-410:2012 ED2

Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control
12 nën 2015

General information

60.60     30 tet 2012

IEC

TC 57

International Standard

33.200  

anglisht   frëngjisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC 61850-7-410:2007 ED1

NOW

PUBLISHED
IEC 61850-7-410:2012 ED2
60.60 Standard published
30 tet 2012

CORRIGENDA / AMENDMENTS

PUBLISHED
IEC 61850-7-410:2012/AMD1:2015 ED2

REVISED BY

IN_DEVELOPMENT