DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

IEC 61850-7-1:2011 ED2

Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models
31 gush 2020

General information

60.60     15 korr 2011

IEC

TC 57

International Standard

33.200  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

IEC 61850-7-1:2011 introduces the modelling methods, communication principles, and information models that are used in the various parts of the IEC 61850-7 series. The purpose is to provide - from a conceptual point of view - assistance to understand the basic modelling concepts and description methods for:
- substation-specific information models for power utility automation systems,
- device functions used for power utility automation purposes, and
- communication systems to provide interoperability within power utility facilities. Compared to the first edition, this second edition introduces:
- the model for statistical and historical statistical data,
- the concepts of proxies, gateways, LD hierarchy and LN inputs,
- the model for time synchronisation,
- the concepts behind different testing facilities,
- the extended logging function. It also clarifies certain items.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC 61850-7-1:2003 ED1

NOW

PUBLISHED
IEC 61850-7-1:2011 ED2
60.60 Standard published
15 korr 2011

CORRIGENDA / AMENDMENTS

PUBLISHED
IEC 61850-7-1:2011/AMD1:2020 ED2