DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

IEC 60965:2009 ED2

Nuclear power plants - Control rooms - Supplementary control points for reactor shutdown without access to the main control room
16 korr 2009

General information

99.60     23 shk 2016

IEC

TC 45/SC 45A

International Standard

27.120.20  

anglisht   frëngjisht  

Buying

Revised

Language in which you want to receive the document.

Scope

IEC 60965:2009 establishes requirements for the supplementary control points provided to enable the operating staff of nuclear power plants to shut down the reactor and maintain the plant in a safe shut-down state in the event that control of the safety functions can no longer be exercised from the main control room, due to unavailability of the main control room or its facilities. The main technical changes with regard to the previous edition are as follows:
- to clarify the definitions and review the requirements;
- to update the references to new IEC standards published since the first issue;
- to align the standard with new editions of the relevant IAEA documents.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC 60965:1989 ED1

NOW

WITHDRAWN
IEC 60965:2009 ED2
99.60 Withdrawal effective
23 shk 2016

REVISED BY

PUBLISHED
IEC 60965:2016 ED3