DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

IEC TR 61000-3-15:2011 ED1

Electromagnetic compatibility (EMC) - Part 3-15: Limits - Assessment of low frequency electromagnetic immunity and emission requirements for dispersed generation systems in LV network
13 sht 2011

General information

60.60     13 sht 2011

IEC

ACART

Technical Report

33.100.10  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

IEC/TR 61000-3-15:2011(E) is concerned with the critical assessment of existing and emerging national and international standards for single and multi-phase dispersed generation systems up to 75 A per phase, particularly converters connected to the public supply low voltage network. This Technical Report intends to serve as a starting point and to ultimately pave the way for the definition of appropriate EMC requirements and test conditions. This Technical Report is limited to EMC issues (immunity and emission) up to 9 kHz and does not include other aspects of connection of generators to the grid. This Technical Report focuses on emission caused by distributed generation (mainly harmonics and inter-harmonics, DC emissions flicker, rapid voltage changes and fluctuations), as well as immunity aspects to normally occurring events in the public supply network (voltage dips and short interruptions, frequency variations, harmonics and interharmonics). Every effort has been made to utilize already existing emission and immunity standards, including the test set-up and existing test equipment in use.

Life cycle

NOW

PUBLISHED
IEC TR 61000-3-15:2011 ED1
60.60 Standard published
13 sht 2011

National adoptions

Pajtueshmëria elektromagnetike (EMC) - Pjesa 3-15: Kufijtë - Vlerësimi i imunitetit elektromagnetik me frekuencë të ulët dhe kërkesat e emetimit për sistemet e gjenerimit të shpërndarë në rrjetin LV

60.60 Standard published

DPS/KT 8 më tepër

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login