DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

IEC PAS 62382:2004 ED1

Electrical and instrumentation loop check
28 jan 2004

General information

99.60     15 nën 2006

IEC

TC 65

Publicly Available Specification

25.040.01  

anglisht  

Buying

Replaced

Language in which you want to receive the document.

Scope

describes the recommended steps to complete a loop check which comprises the activities between the completion of loop construction (including installation and point-to-point checks) and the start-up of the cold commissioning. This document is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, Panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems except as they relate to the loops being checked (i. e. a motor starter or a power supply to a 4-wire transmitter).

Life cycle

NOW

WITHDRAWN
IEC PAS 62382:2004 ED1
99.60 Withdrawal effective
15 nën 2006

REVISED BY

WITHDRAWN
IEC 62382:2006 ED1