Revised
describes the physical requirements for the safe operation of the process analyser measuring system installed in an AH in order to ensure its protection against fire, explosion and health hazards. This standard extends beyond IEC 60079-16 to include houses with Zone 2 interiors and to apply to toxic hazards. (Appropriate national guidelines on toxic hazards are to be followed.)
Revises
IEC 61285:1994 ED1
IEC 61285:2004 ED2
99.60
Withdrawal effective
24 shk 2015
PUBLISHED
IEC 61285:2015 ED3