DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

IEC 60761-2 ED3

Radiation protection instrumentation - Equipment for continuous monitoring of radioactivity in gaseous effluents - Part 2: Specific requirements for radioactive aerosol monitors including transuranic aerosols

General information

50.20     6 shk 2026

PRVD    20 mar 2026

IEC

TC 45/SC 45B

International Standard

13.280  

Scope

IEC 60761-2:2026 is applicable to equipment intended for simultaneous, delayed or discrete sequential measurement of aerosols in gaseous effluents discharged into the environment.
It is applicable to equipment designed to fulfil the following functions:
- the measurement of the volumetric activity (Bq/m3) of the aerosols in either gaseous effluents or the released total activity of aerosols (Bq), or both;
- the actuation of an alarm signal when either a predetermined volumetric activity or a predetermined total released activity of aerosols is exceeded.
This equipment is intended for measurement over a wide range of activity, including very small quantities in the presence of a much larger natural background. The daughters of 222Rn (radon) and 220Rn (thoron) are naturally occurring aerosols contributing to the natural background. The discrimination against natural activity can be an important problem in monitoring low level activity. In order to provide more and better information, complementary or retrospective laboratory analysis of the filters after collection can be performed.

The objective of this document is to establish specific standard requirements, including technical characteristics and general test conditions, and to give examples of acceptable methods for aerosol effluent monitors.

The general requirements, technical characteristics, test procedures, radiation characteristics, electrical, mechanical, safety and environmental characteristics are given in IEC 60761-1. Unless otherwise stated, these requirements apply to this document.

Life cycle

PREVIOUSLY

PUBLISHED
IEC 60761-2:2002 ED2

NOW

IN_DEVELOPMENT
IEC 60761-2 ED3
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
6 shk 2026

Preview

Vetëm seksionet informative të projekteve janë në dispozicion të publikut. Për të parë përmbajtjen e plotë, do t'ju duhet të krijoni një llogari. Nëse jeni anëtar, ju lutemi hyni në llogarinë tuaj duke klikuar në butonin "Identifikohu".

Login