DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

IEC TS 62933-3-2:2023 ED1

Electrical energy storage (EES) systems - Part 3-2: Planning and performance assessment of electrical energy storage systems - Additional requirements for power intensive and renewable energy sources integration related applications
6 jan 2023

General information

60.60     6 jan 2023

IEC

TC 120

Technical Specification

13.020.30  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

IEC TS 62933-3-2:2023 provides the requirements for power intensive and renewable energy sources integration related applications of EES systems, including grid integration, performance indicators, sizing and planning, operation and control, monitoring and maintenance. The power intensive applications of EES systems are usually used to improve the dynamic performance of the grid by discharging or charging based on corresponding control strategies. The renewable energy sources integration related applications of EES systems are usually used to mitigate short-term fluctuation and/or to keep long-term stability. This document includes the following applications of EES systems:
– frequency regulation/support;
– grid voltage support (Q(U)) (“volt/var support”);
– voltage sag mitigation;
– renewable energy sources integration related applications;
– power oscillation damping (POD).

Life cycle

NOW

PUBLISHED
IEC TS 62933-3-2:2023 ED1
60.60 Standard published
6 jan 2023