DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

IEC 61326-2-4:2020 ED3

Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-4: Particular requirements - Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and for equipment for insulation fault location according to IEC 61557-9
27 tet 2020

General information

60.60     27 tet 2020

IEC

TC 65/SC 65A

International Standard

17.220.20     25.040.40     33.100.20  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

IEC 61326-2-4:2020 specifies more detailed test configurations, operational conditions and performance criteria than IEC 61326-1 for equipment for
- insulation monitoring according to IEC 61557-8;
- insulation fault location according to IEC 61557-9.
This applies to insulation monitoring devices and for equipment for insulation fault location systems permanently or semi-permanently connected to the distribution system.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC 61326-2-4:2012 ED2

NOW

PUBLISHED
IEC 61326-2-4:2020 ED3
60.60 Standard published
27 tet 2020

National adoptions

Pajisje elektrike për matje, kontroll dhe përdorim laboratorik - Kerkesat për pajtueshmërinë elektromagnetike EMC - Pjesa 2-4: Kërkesa të veçanta – Konfigurimet e provës, kushtet e punës dhe kriteret e performancës për pajisjet e monitorimit të izolimit sipas IEC 61557-8 dhe për pajisjet për vendndodhjen e defektit të izolimit sipas IEC 61557-9

60.60 Standard published

DPS/KT 9 më tepër