DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

IEC 62668-2:2019 ED1

Process management for avionics - Counterfeit prevention - Part 2: Managing electronic components from non-franchised sources
9 korr 2019

General information

60.60     9 korr 2019

IEC

TC 107

International Standard

03.100.50     31.02     49.06  

anglisht   frëngjisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

IEC 62668-2:2019, defines requirements for avoiding the use of counterfeit, recycled and fraudulent components when these components are not purchased from the original component manufacturer (OCM) or are purchased from outside of franchised distributor networks for use in the aerospace, defence and high performance (ADHP) industries. This practice is used, as derogation, only when there are no reasonable or practical alternatives.
NOTE: Typically this document is used in conjunction with IEC 62239-1 and IEC 62668-1, enabling ADHP industries to manage and avoid the use of counterfeit, recycled and fraudulent components in their supply chains.
Although developed for the ADHP industry, this document can be used by other high-performance and high-reliability industries, at their discretion.
This first edition cancels and replaces the second edition of IEC TS 62668-2 published in 2016. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the second edition of IEC TS 62668-2:
a) updates to the risk assessment process, including reference to SAE AS6081;
b) updates to the test methods, including reference to the SAE AS6171 test methods published and in development;
c) updates in line with IEC 62668-1 for definitions and references to DFARS.

Life cycle

PREVIOUSLY

Revises
IEC TS 62668-2:2014 ED1

Replaces
IEC TS 62668-2:2016 ED2

NOW

PUBLISHED
IEC 62668-2:2019 ED1
60.60 Standard published
9 korr 2019

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login