DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

IEC TS 62786-1:2023 ED1

Distributed energy resources connection with the grid - Part 1: General requirements
28 nën 2023

General information

60.60     28 nën 2023

IEC

TC 8

Technical Specification

29.240.01  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

IEC TS 62786-1:2023, which is a Technical Specification, provides principles and general technical requirements for distributed energy resources (DER) connected to an electric power network (in the following: the "network"). It applies to the planning, design, operation and connection of DER to networks. It includes general requirements, connection scheme, choice of switchgear, normal operating range, immunity to disturbances, active power response to frequency deviations, reactive power response to voltage changes, EMC and power quality, interface protection, connection and start to generate electrical power, active power management, monitoring, control and communication, and conformance tests.
It is supplemented by additional parts of IEC 62786 series, covering specific aspects.
This document specifies interface and interoperability requirements for connection of DER to a network operating at a nominal frequency of 50 Hz or 60 Hz. These requirements are intended for application at the point of connection (POC) of the DER to the grid. In some situations, the requirements can be the applied at the AC terminals of the generator. Additional parts of IEC 62786 provide more specific requirements.
DER include distributed generation and electrical energy storage in the form of synchronous generators, asynchronous generators, power converters, etc., connected to the medium voltage (MV) or low voltage (LV) network.

Life cycle

PREVIOUSLY

Replaces
IEC TS 62786:2017 ED1

NOW

PUBLISHED
IEC TS 62786-1:2023 ED1
60.60 Standard published
28 nën 2023

National adoptions

Lidhja e burimeve energjetike të shpërndara me rrjetin - Pjesa 1: Kërkesa të përgjithshme

10.00 Proposal for new project registered

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login