DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

SSH EN 61124:2012

Prova e besueshmërisë - Provat e pajtueshmërisë për shkallën konstante të gabimit dhe intensitetin konstant të gabimit

Reliability testing - Compliance tests for constant failure rate and constant failure intensity
12 nën 2013

General information

60.60     5 korr 2013

DPS

DPS/KT 8

European Norm

03.120.30     19.020     21.020  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

IEC 61124:2012 gives a number of optimized test plans, the corresponding operating characteristic curves and expected test times. In addition the algorithms for designing test plans using a spreadsheet program are also given, together with guidance on how to choose test plans. This standard specifies procedures to test whether an observed value of: failure rate, failure intensity, meantime to failure (MTTF), and mean operating time between failures (MTBF). The main changes with respect to the previous edition are as follows: - A number of new test plans have been added based on the Russian standard GOST R 27.402 [1], and it is intended to align the new edition of MIL-HDBK-781 [2] with this edition. Algorithms for optimizing test plans using a spreadsheet program are given and a number of optimized test plans are listed. Furthermore, emphasis is laid on the fact that the test should be repeated following design changes; - Discrepancies in test plans A, B as well as Annexes A and B that originated in IEC 60605-7 [3], now withdrawn, have been corrected so these test plans differ from those given in previous editions of IEC 61124. As requested by the National Committees, mathematical background material and spreadsheet program information has been moved to informative annexes. In addition, the symbol lists have been divided, so that some annexes have separate lists of symbols; - Guidance on how to choose test plans has been added as well as guidance on how to use spreadsheet programs to create them. Test plans A.1 to A.9 and B.1 to B.13 have been corrected; - Subcluses 8.1, 8.2, 8.3, Clause 9, Annex C, Clauses G.2, I.2, I.3 and Annex J are unchanged, except for updated terminology and references.

Life cycle

PREVIOUSLY

Replaces
SSH EN 61124:2006

NOW

PUBLISHED
SSH EN 61124:2012
60.60 Standard published
5 korr 2013

Related project

Adopted from EN 61124:2012

Adopted from IEC 61124 Ed. 3.0 b

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login