DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

SSH EN 60512-9-3:2011

Bashkues për pajisjet elektronike - Provat dhe matjet - Pjesa 9-3: Provat e qëndresës - Prova 9c: Veprimi mekanik (çiftimi dhe ndarja) me ngarkesë elektrike

Connectors for electronic equipment - Tests and measurements - Part 9-3: Endurance tests - Test 9c: Mechanical operation (engaging/separating) with electrical load
27 maj 2013

General information

60.60     27 maj 2013

DPS

DPS/KT 8

European Norm

31.220.01  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

IEC 60512-9-3:2011 defines a standard test method to assess the mechanical and electrical operational endurance, i.e. engaging and separating cycles, of a connector in an operating mode which includes a specified electrical load. This second edition cancels and replaces Test 9c of IEC 60512-5, issued in 1992, and constitutes a technical revision. The main technical changes with regard to the previous edition are as follows: - An additional requirement to 4.1 stating that if more than one electrical circuit is wired for testing, the wiring shall be carried out in a parallel electrical circuit. - Subclauses 4.3 through 4.7 were removed and replaced by 4.2 through 4.4. This publication is to be read in conjunction with <a href='http://webstore.iec.ch/webstore/webstore.nsf/ArtNum_PK/26692'>IEC 60512-1:2001</a> and <a href='http://webstore.iec.ch/webstore/webstore.nsf/ArtNum_PK/35881'>IEC 60512-1-100:2006</a>.

Life cycle

PREVIOUSLY

WITHDRAWN
SSH EN 60512-9-3:2006

NOW

PUBLISHED
SSH EN 60512-9-3:2011
60.60 Standard published
27 maj 2013

Related project

Adopted from EN 60512-9-3:2011

Adopted from IEC 60512-9-3 Ed. 2.0 b