SSH EN 45510-2-5:2002

Udhëzues për prokurimin e pajisjeve te centraleve elektrikë - Pjesa 2 - 5 : Pajiset elektrike - Motorët

Guide for procurement of power station equipment - Part 2-5: Electrical equipment - Motors
27 korr 2005

General information

60.60     1 korr 2005

DPS

DPS/KT 269

European Norm

27.100     29.160.30  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

This standard gives guidance on writing the technical specification for the procurement of motors for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
This Guide covers motors within installations primarily concerned with the generation of electrical power. However, as a complete electrical drive system is not defined in this Guide, attention is drawn to the possible additional electrical and mechanical stresses to which the motor may be subjected e.g. by a static AC converter/inverter. Reference should be made to IEC 60034-17.
The equipment covered by this Guide is defined by its function rather than design type. Therefore, the guidance to the specification is stated in performance terms rather than being specified by a detailed description of the equipment to be supplied.
This Guide indicates to potential purchasers how their specification should be prepared so that:
- the equipment type and capacity interfaces correctly with other elements of the systems;
- predicted performance is achieved;
- ancillary equipment is properly sized;
- reliability, availability and safety requirements are achieved;
- proper consideration is given to the evaluation process and the quality measures to be applied.
This Guide does not determine the type of specification (e.g. detailed, performance, functional) or the extent of supply for any given contract which is normally decided on the basis of the purchaser’s project strategy. It does not cover:
- any commercial, contractual or legal issues which are normally in separate parts of an enquiry;
- any allocation of responsibilities which are determined by the contract.
This Guide does not prescribe the arrangement of the documents in the enquiry.

Related directives

Directives related to this standards.

93/38/EEC

Procedura prokurimi të entiteteve që veprojnë në sektorët e ujit, energjisë, transportit dhe telekomunikacionit

93/38/EEC

Procedura prokurimi të entiteteve që veprojnë në sektorët e ujit, energjisë, transportit dhe telekomunikacionit

Life cycle

NOW

PUBLISHED
SSH EN 45510-2-5:2002
60.60 Standard published
1 korr 2005

Related project

Adopted from EN 45510-2-5:2002

Adopted from EN 45510-2-5:2002

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login