DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

DS CEN/TR 12101-5:2005

Sistemet e kontrollit të tymit dhe te nxehtësisë - Pjesa 5:Udhëzimet për rekomandimet funksionale dhe metodat e llogaritjes për sistemet e ventilimit të nxehtësisë dhe tymit

Smoke and heat control systems - Part 5: Guidelines on functional recommendations and calculation methods for smoke and heat exhaust ventilation systems
30 qer 2006

General information

60.60     30 qer 2006

DPS

DPS/KT 286

Technical Report

13.220.99     23.120  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

This Technical Report gives recommendations and guidance on functional and calculation methods for smoke and heat exhaust ventilation systems for steady-state design fires. It is intended for a variety of building types and applications, including single-storey buildings, mezzanine floors, warehouses with palletized or racked storage, shopping malls, atria and complex buildings, car parks, places of entertainment and public assembly and un-compartmented space within multi-storey buildings.
This Technical Report does not include any functional recommendations for design parameters where the primary purpose of the SHEVS is to assist fire-fighting.
NOTE Such functional recommendations need to be agreed with the fire service responsible for the building in question. The calculation procedures set out in the annexes of this Technical Report can be used to design the SHEVS to meet whatever recommendations have been agreed.
This Technical Report does not cover the following:
- smoke clearance, where smoke is exhausted from a building after the fire has been suppressed;
- cross-ventilation, where wind-induced or fan-induced air currents sweep smoke through and out of the building, usually as part of fire-fighting operational procedures;
- ventilation of stairwells, which usually represents a special application of smoke clearance and which does not necessarily protect the continued use of the stairwell;
- fully-involved fires.

Life cycle

NOW

PUBLISHED
DS CEN/TR 12101-5:2005
60.60 Standard published
30 qer 2006

Related project

Adopted from CEN/TR 12101-5:2005

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login