DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

SSH ENV 12977-2:2005

Sistemet termike djellore dhe pjesët përbërëse - sistemet e prodhuara me porosi te veçantë - Pjesa 2 : Metodat e provës

Thermal solar systems and components - Custom built systems - Part 2: Test methods
1 jan 2005
95.99 Withdrawal of Standard   28 tet 2010

General information

95.99     28 tet 2010

DPS

DPS/KT 269

Pre Standard

27.160  

anglisht  

Buying

Shfuqizuar

Language in which you want to receive the document.

Scope

This European Prestandard applies to small and large custom built solar heating systems with liquid heat transfer medium for residential buildings and similar applications, and gives test methods for verification of the requirements specified in ENV 12977-1.
This Prestandard includes also a method for thermal performance characterization and system performance prediction of small custom built systems by means of component testing and system simulation.
Furthermore, the Prestandard contains methods for thermal performance characterization and system performance prediction of large custom built systems.
This European Prestandard applies to the following types of small custom built solar heating systems:
- systems for domestic hot water preparation only;
- systems for space heating only;
- systems for domestic hot water preparation and space heating.
This European Prestandard applies to large custom built solar heating systems, primarily to solar preheat systems, with one or more storage vessels, heat exchangers, piping and automatic controls and with collector array(s) with forced circulation of fluid in the collector loop.
This Prestandard does not apply to:
- systems with a store medium other than water (e.g. phase-change materials);
- systems for space heating with a distribution fluid other than water for the space heating subsystem (e.g. air systems);
- small custom built systems with a circulation line entering any store having a feedback on the solar heated store.
Principally, systems with circulation line may be tested in accordance to the methods described in this Prestandard, if the connecting port for the circulation line is kept closed during the tests. This should, however, stated in the test report.

Life cycle

NOW

WITHDRAWN
SSH ENV 12977-2:2005
95.99 Withdrawal of Standard
28 tet 2010

REVISED BY

WITHDRAWN
DS CEN/TS 12977-2:2010

Related project

Adopted from ENV 12977-2:2001