DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Fixed firefighting systems - Components for sprinkler and water spray systems - Part 15: Spray pattern sprinklers with a k-factor of at least K160, extended coverage sprinklers of at least K80 and control mode special application sprinklers

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 më tepër

Steel wire ropes - Safety - Part 5: Stranded ropes for lifts

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 më tepër

Crane - Safety - Non-fixed load lifting attachments

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 më tepër

Fixed firefighting systems - Foam systems - Part 1: Requirements and test methods for components

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 më tepër

Siguria e makinerisë - Pajisje ndërbllokimi që lidhen me mbrojtëse - Parimet për projektimin dhe zgjedhjen (ISO 14119:2013)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 më tepër

Fixed firefighting systems - Water mist systems - Part 1: Design, installation, inspection and maintenance

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 më tepër

Fixed firefighting systems - Water mist systems - Part 17: Test protocol for residential occupancies for automatic nozzle systems

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 më tepër

Sistemet e palëvizshme të mbrojtjes nga zjarri - Sistemet shuarës me gaz - Pjesa 2: Vetitë fizike dhe projektimi i sistemeve të shuarjes me gaz për shuarset FK-5-1-12 (ISO 14520-5:2019, modifikuar)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 më tepër

Tower cranes - Anti-collision systems - Safety requirements

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 më tepër

Fixed firefighting systems - Components for water mist systems - Part 3: Requirements and test methods for check valves

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 më tepër

Advanced fatigue testing methods — Part 1: Self-heating measurements

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 më tepër

Advanced fatigue testing methods — Part 2: Stiffness method

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 më tepër

Robotic construction system for shotcrete digitization and automation through advanced perception, cognition, mobility and additive manufacturing skills

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 më tepër

Efikasiteti i energjisë i kamionëve industriale - Metodat e provës - Pjesa 1: Të përgjithshme

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 më tepër

Efikasiteti i energjisë i kamionëve industriale - Metodat e provës - Pjesa 2: Kamionë vetëlëvizës kontrolluar nga punëtori, traktorë rimorkimi dhe kamionë transportues-tonazhi

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 më tepër

Efikasiteti i energjisë i kamionëve industriale - Metodat e provës - Pjesa 3: Kamionë me element ngritës për trajtimin e konteinerit

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 më tepër

Energy efficiency of industrial trucks - Test methods - Part 6: Container straddle carrier (ISO 23308-6:2025)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 më tepër

Rregullat e sigurisë për ndërtimin dhe instalimin e ashensorëve - Ashensorët ekzistues - Pjesa 82- Rregullat për përmirësimin e mundësisë së hyrjes në ashensorët ekzistues për personat, përfshirë personat me aftësi të kufizuar

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 më tepër